Works in 2025
Retaining wall - Murviel les Montpellier (2025)
Initiation session for members of the "Murviel Patrimoine" Association during European Days.
Restor...
» More details
Retaining wall - Royère de Vassivière (2025)
Continuation of the restoration of this building, approximately 12 meters long and 1.10 meters in av...
» More details
Retaining wall - St Quentin la Chabanne (2025)
4-day introductory session organized by the PNR of Millevaches. Three intended for the staff of the ...
» More details
Traditional calade - Narbonne (2025)
Creation of a 25 m² calade as part of the "Stone Sector Enhancement" program led by the 7 Regional N...
» More details
Inclosing wall - Grandsaigne - Clédat (2025)
3-day introductory session organized by the PNR of Millevaches.
Reconstruction of a portion of the...
» More details
Retaining wall - Millevaches (2025)
Creation of approximately 2 m3 along the edge of the newly created pond on the site of the Maison d...
» More details
Retaining wall - Royère de Vassivière (2025)
Four-day introductory session for the general public organized by the PNR of Millevaches at the Soum...
» More details
Inclosing wall - Montpellier West (2025)
Restoration of this small divider in the Montpellier suburbs.
With a total length of 12 m and an a...
» More details