Retaining wall - Chavanat
Continuation and conclusion of the construction site from September 2022.
3-day introductory session organized by the PNR de Millevaches and intended for the general public.
Partial reconstruction of a small retaining wall along the D3 over a length of approximately 15 m and an average height of 0.80 m.
The draft of a small separating wall began nearby. The final work was completed in May 2024. (Trad. IA)