Retaining wall - Montferrier sur Lez
First phase (June):
Retaining wall built below a ramp leading to the property's parking lot, approximately seven meters long and an average height of one meter.
The overall landscaping of the slope and the construction of the steps were done in the fall.
Second phase (December)
Execution of the right part in accordance with the framework done on the right side and the steps of the staircase. (Trad. IA)