Works in 2021
Compensatory measures - Poussan (2021)
Partial rehabilitation of walls and two buildings as part of compensatory measures in Natural Zones ...
» More details
Inclosing wall - La Nouaille (2021)
3-day introductory session organized by the PNR de Millevaches and intended for elected officials an...
» More details
Retaining wall - Meymac (2021)
3-day introductory session organized by the PNR de Millevaches, intended for elected officials and ...
» More details
Retaining wall - Assas (2021)
Partial reconstruction of a retaining wall along a communal path. Over a length of 10 meters, approx...
» More details
Formation - Bages (2021)
6-day introductory session organized by the Centre Batipole en Limouxin as part of the Professional...
» More details
Landscaping 2 - Claret (2021)
Continuation and completion of the restoration of this wall, approximately 70 meters long and 1 mete...
» More details
Landscaping 1 - Claret (2021)
Beginning of the restoration of this wall, approximately 70 meters long and 1 meter high, within the...
» More details