Drystone: know-how and heritage

Works in 2017

« Previous works: 2016 - Following works: 2018 »

Inclosing wall - Villeveyrac (2017)

Creation of a 20-meter-long and 0.50-meter-high separating wall on a second access to the Fontdouce ...

» More details

+

Formation - Murviel les Montpellier (2017)

Second phase of the restoration, at a height ranging from 1 m to 2.2 m, of this long wall approximat...

» More details

+

Ecological Spiral - Murviel les Montpellier (2017)

Construction of this small structure as part of the landscaping of the public space located next to ...

» More details

+

Retaining walls - Enveitg (2017)

Construction of these 2 retaining walls bordering the access to the public space located near the To...

» More details

+

Formation - Armissan (2017)

3-day training course organized by the CFPPA des Pays d'Aude and intended for Aude territorial agen...

» More details

+

Retaining walls - Clapiers (2017)

Creation of 2 low walls as part of a garden layout developed by the design office Garden Gecko. The ...

» More details

+

Retaining wall - Nyer (2017)

Creation of this retaining wall approximately 12 meters long and an average height of 1 meter. Ac...

» More details

+

Retaining wall - Matemale (2017)

Creation of this small separating wall, over 2 days. Action organized by the PNR of the Catalan P...

» More details

+

Landscaping - Estavar (2017)

Creation of 3 separating walls in a space redeveloped by the municipality. At a height of approximat...

» More details

+

Fountain with arched vault - Murviel les Montp. (2017)

Construction of this small structure on private land. Once the development is finished, the fountain...

» More details

+

Retaining wall - Claret (2017)

Restoration of this wall over a length of approximately 20 m and an average height of 0.6 m. Interns...

» More details

+

Landscaping - Murviel les Montpellier (2017)

Creation of a cobblestone path and a wall with a keystone arch window, during the European Days of C...

» More details

+

Retaining wall - Murviel les Montpellier (2017)

First phase of the restoration, at a height ranging from 1 m to 2.2 m, of this long wall approximate...

» More details

+

Retaining wall - (2) - Villeveyrac (2017)

Creation of a 20-meter-long wall on the east side and restoration of an 18-meter-long wall on the no...

» More details

+

Inclosing wall - Villeveyrac (2017)

Construction of 2 partition walls perpendicular to the access point of the developed area of the Fon...

» More details

+

Enclosing wall - Prades le Lez (2017)

Construction carried out at the request of the [url=http://www.herault.fr/environnement/maison-depar...

» More details

+
« Previous works: 2016 - Following works: 2018 »